Curved Tool Rest Set CTR-4 Ø25mm Shaft

Description

Reach far into the interior of bowls with ease with these 4 invaluable tool rests. These comfortable, ergonomically designed tool rests that will provide you all-day turning support. With the unique design, your fingers will fit snugly on the rest and let you get closer to your work. The ultra smooth, round hardened steel top let will let you effortlessly glide your lathe tool for superior results.

Features

  • Ø25mm shaft
  • Approximately 150mm overall height
  • 1 x S Type tool rest (Round Body) 230mm long
  • 1 x 90 Deg tool rest (Round Body) 63mm radius curve
  • 1 x 90 Deg tool rest (Flat Body) 51mm radius curve
  • 1 x 45 Deg tool rest (Flat Body) 38mm radius curve

Specifications

ORDER CODECTR-4
MODELCurved Tool Rest Set
Type~
No. of Piece38, 51, 63, 230
Size~
Internal Thread~
External ThreadMost Wood Lathes
Suits